The City continues to invest in 64 Avenue to improve traffic flow, increase road safety, and prepare for future growth.

Project description

64 Avenue is an important east-west connector linking Surrey residents to City of Delta and the Township of Langley. It's a busy corridor expected to get even busier especially in the east with the Surrey Langley SkyTrain to Clayton and a future Surrey hospital in Cloverdale

We have already widened much of 64 Avenue from two to four travel lanes with improved walking and cycling pathways. Next, we plan to widen the stretch between 177B to 184 Street.

We will coordinate installation of BC Hydro duct during road works to minimize construction impacts to residents. BC Hydro's duct bank project will support growth in the Cloverdale community and service the new Surrey hospital and BC Cancer Centre.
 

Project timing

We anticipate construction to start in February 2024 and be completed in spring 2025.  
We may need to close the road for a  four-week period in  summer 2024 for construction. We will post updates on this webpage.

Key improvements

  • Repaving and widening the road from two to four travel lanes to reduce congestion and prepare for future growth
  • Improving access, safety and circulation with new traffic signals at 180 Street, 181A Street, and Claytonwood Gate
  • Adding a new multiuse path on the south side of the street for safer cycling and walking.

In order to widen the road for additional lanes and multiuse paths, it will be necessary to remove on-street parking.

Project design

Below are typical cross-sections for improvements between 177B Street and 184 Street.

Open cross-section as a PDF.

Contact

If you have questions or comments, please contact the Design & Construction Division at 604-591-4253 or EngWebmail@surrey.ca