The City plans to make road improvements on 96 Avenue between 114 Street and 120 Street to improve road safety, traffic flow, and neighbourhood access.

Project description

96 Avenue is an important east-west link serving both North Surrey and North Delta residents. 

The City plans to make road improvements on 96 Avenue between 114 Street and 120 Street to improve road safety, traffic flow, and neighbourhood access.

Key improvements include the following:

  • multi-use paths along both sides of the road to make it easier and safer to cycle and walk in the neighbourhood
  • LED streetlights to increase visibility and safety
  • left turn lanes at 116 Street intersection to improve traffic flow
  • parking pockets where possible

Project timeline

Improvements will be made in phases:

Phase 1: 116 Street to 120 Street
Construction is anticipated to begin spring 2025 and be completed in 2025

Phase 2: 114 Street to 116 Street 
Construction timeline to be determined in the future.

Project design

View presentation drawings for detailed information on planned improvements for 96 Avenue. This information will be shared at the public meeting as well.

Share your feedback

If you can't attend the public meeting, you can provide feedback at EngWebmail@surrey.ca. Please provide feedback by November 12, 2024.