Status

Awarded


Modern Niagara Vancouver Inc.

Closing Date

would prefer to receive Quotations on or before October 12, 2022


Revised November 16, 2022

Contact

Sunny Kaila
Manager, Procurement Services 
Finance Department
Tel:  (604) 590-7274
Email:  purchasing@surrey.ca

Addendum

REQUEST FOR QUOTATION

SCOPE OF WORK 


The Work covered under this project consists of the furnishing of all superintendence, overhead, labour, materials, tools, equipment, insurance, fuel, transportation and all things necessary for and incidental to the satisfactory performance and completion of construction and renovation of Supply, Delivery and Installation of HVAC Replacement – Guildford Library, located at 15105 105 Avenue, Surrey, BC V3R 7G8 (the “Place of Work”) in strict accordance with the Specifications and accompanying Drawings and subject to all terms and conditions of the Contract.

The Work consists of but is not necessarily limited to the following:

The removal and disposal of the existing HVAC system and the supply and installation of a new HVAC system including all new electrical and mechanical work (including roof work, and other associated works e.g. structural, etc.) as identified in the attached specifications and drawings.

INFORMATION MEETING

An information meeting will be hosted by the City Representative to discuss the City’s requirements under this RFQ (the “Information Meeting”). While attendance is at the discretion of Contractors, Contractors who do not attend will be deemed to have attended the Information Meeting and to have received all of the information given at the Information Meeting.

At the time of issuance of this RFQ a meeting has been scheduled as follows:

Date: September 20, 2022
Time: 10:00 a.m.
Location: 15105 105 Ave, Surrey, BC V3R 7G8

It is possible that some questions raised, and information provided during the Information Meeting may be the only source of critical information essential to prepare and submit a successful Quotation. Contractors are responsible to ensure they are fully informed and have a clear understanding of the requirements.

Contractors are to examine the site prior to submitting a Quotation to fully acquaint themselves with all existing conditions reasonably inferable from examination of the site and its surroundings and the RFQ and to make allowance for such conditions in the Quotation. By submitting a Quotation, a Contractor represents that it has examined the site fully as to all conditions, contingencies, risks and circumstances, local or otherwise, which might influence or affect the performance of the Work.

Note: No minutes of the information meeting and site tour will be provided

The Contractor is responsible for parking fees, if applicable.

ADDENDA

If the City determines that an amendment is required to this RFQ, the City Representative will issue a written addendum by posting it on the BC Bid website at www.bcbid.gov.bc.ca and the City website at www.surrey.ca (collectively, the “Websites”), and upon posting, any addenda will form a part of this RFQ. It is the responsibility of Contractors to check the Websites for addenda. The only way this RFQ may be added to, or amended in any way, is by a formal written addendum. No other communication, whether written or oral, from any person will affect or modify the terms of this RFQ or may be relied upon by any Contractor. By delivery of a Quotation the Contractor is deemed to have received, accepted and understood the entire RFQ, including any and all addenda.

All inquiries related to this RFQ should be directed in writing to purchasing@surrey.ca