Status

Awarded


C3 Mainline Inspections Inc.

Closing Date

The Owner would prefer to receive Quotations on or before March 16th, 2022 - REVISED*


Revised May 17, 2022

Contact

Sunny Kaila
Procurement Manager
Finance Department
Tel:  (604) 590-7274
Email:  purchasing@surrey.ca

REQUEST FOR QUOTATIONS

INTRODUCTION
PURPOSE OF THE REQUEST FOR QUOTATIONS

The City of Surrey (the “Owner”) invites Contractors to provide a quotation on the form attached as Schedule C (the “Quotation”) for the supply of the goods (if any) and services described in Schedule A (the “Work”).  The description of the Work sets out the minimum requirements of the Owner.  A person that submits a Quotation (the “Contractor”) should prepare a Quotation that meets the minimum requirements, and may as it may choose, in addition, to also include goods, services or terms that exceed the minimum requirements.

DESCRIPTION OF SCOPE OF WORK
The Contractor shall furnish all necessary labour, supervision, materials, plant, equipment, layout, survey, permits, and inspections, and related services to video inspect storm sewer mains, and manholes as noted in the Contract Drawings.  Furnish certificates confirming work conforms to requirements of Authorities having jurisdiction.

The Work generally includes, but not limited to, zoom camera video inspection of storm mains, manhole inspections, provision for traffic control, and other related works.

The Work will be undertaken at various locations throughout the City of Surrey as detailed in the attached drawings.

The detailed scope of work is as described in the Supplementary Specifications -Project (Schedule B - Appendix 2) and Contract Drawings (Project) (Schedule B – Appendix 3).

The lack of and/or omission of detailed specifications does not minimize the acceptable levels of service and only the best commercial practices are acceptable.

Contractor to comply with all BC Plumbing Code, BC Fire Marshal, BC Workers’ Compensation Board, National Building Code of Canada, BC Boiler Inspector, BC Electrical Inspector, National Fire Protection Association, and any other authorities having local jurisdiction.  Failure to abide by these rules and regulations will result in being immediately escorted from the work site.

SCOPE OF WORK 
As part of the scope of Services, the Contractor is to furnish and assume full responsibility for everything required for the orderly progress and proper execution and completion of the Services, whether temporary or permanent and whether or not incorporated into the Services including, but not limited to, materials, equipment, labour, transportation, construction equipment and machinery, tools, appliances, temporary facilities and utilities, and all other facilities and incidentals.

The Services in this agreement involves:

  • The zoom camera inspection of approximately 505,894 lineal meters of Storm Sewer Mainlines ranging from 150 to 3300 mm in diameter.
  • The zoom camera inspection of 296 Flood Boxes on Surrey’s river dykes.
  • The video or 3D panorama inspection of approximately 7618 manholes, at various locations within the City as shown on the drawings in Appendix 3.

ADDENDA
If the City determines that an amendment is required to this RFQ, the City Representative will issue a written addendum by posting it on the BC Bid website at www.bcbid.gov.bc.ca and the City website at www.surrey.ca  (collectively, the “Websites”), and upon posting, any addenda will form a part of this RFQ.  It is the responsibility of Contractors to check the Websites for addenda.  The only way this RFQ may be added to, or amended in any way, is by a formal written addendum.  No other communication, whether written or oral, from any person will affect or modify the terms of this RFQ or may be relied upon by any Contractor.  By delivery of a Quotation the Contractor is deemed to have received, accepted and understood the entire RFQ, including any and all addenda.

All inquiries related to this RFQ should be directed in writing to the contact person named above.