2012 Walking Projects

The following projects to improve walking were built in 2012:

100 Avenue (east of 144 Street) Median Refuge

An aerial view of a median refuge in Surrey.

See the sidewalk project to put in a new median refuge at 100 Avenue, east of 144 Street, close to the Green Timbers Urban Forest.

142A Street and 85B Avenue Curb Bulges

A curb bulging into a cul de sac

See the 142A Street and 85B Avenue Curb Bulge Project by Brookside Elementary in Surrey.

148 Street (9500 Block) Median Refuge

An aerial view of a median refuge in Surrey.

See the new median refuge built on 148 Street (9500 Block) in Surrey.

156 Street (92 Avenue to 96 Avenue) Sidewalk Project

See Surrey's sidewalk project to put in things like new sidewalks, bike lanes, and a median refuge on 156 Street (92 Avenue to 96 Avenue).

166 Street (North of Fraser Highway) Sidewalk Project

See the sidewalk that was constructed on the west side of 166 Street, North of Fraser Highway.

168 Street (5800 block) Sidewalk Project

See the project to put in a new sidewalk on 168 Street, 5800 block, in Surrey.

65 Avenue and 185 Street Curb Bulges

Learn about the curb bulge project on 65 Avenue and 185 Street, near Hillcrest Elementary School.

68 Avenue (142 Street to 144 Street) Sidewalk

See the sidewalk project including a new sidewalk, curb and gutter going in on 68 Avenue, from 142 Street to 144 Street in Surrey.

90 Avenue (12100 Block to 123A Street) Sidewalk

See the transportation project to put in a new sidewalk on 90 Avenue (12100 Block to 123A Street), close to Kirkbride Elementary School.

Crestview Drive (13600 Block) Walkway

Learn about the sidewalk project putting in a new walkway on Crestview Drive, 13600 Block.