Skip navigation

52 Avenue to 54 Avenue Connector Road - Package R06/13

Number:

M.S.1713-006-11

Title:

52 Avenue to 54 Avenue Connector Road - Package R06/13

Description:

CITY OF SURREY
INVITATION TO TENDER
CONTRACT M.S.1713-006-11 

Tenders are invited for Contract M.S. 1713-006-11, involving installation of:
1) 7,500 cubic meters excavation;
2) 160 meters sanitary forcemain;
3) 325 meters storm sewer;
4) bio-pond construction and riparian planting;
5) Streetlighting;
6) 1,700 tonnes asphalt paving and related work.

Tenders must be submitted in a sealed package, marked on the outside with "Tender for Contract MS 1713-006-11, 52 Avenue to 54 Avenue Connector Road - Package R06/13" and must be received at the office of the first floor Main Reception/Information Desk, Surrey City Hall, 13450-104 Avenue, Surrey, BC Canada V3T 1V8, not later than 11:00am (local time), on May 1, 2014 and will be opened in public immediately thereafter.

Copies of the Drawings, Tender Submission Documents and Contract Documents may be viewed at the Vancouver Regional Construction Association, 3636 East 4th Avenue, Vancouver, BC V5M 1M3, and the Engineering Department Front Counter at Surrey City Hall.

Tenderers may obtain electronic files of the contract documents and drawings from WEB Engineering Ltd., bsnow@webengineering.ca, 4173 Dawson Street, Burnaby, BC. The files will be transmitted via internet to Tenderers who will be responsible for printing. Hard copies of the drawings and documents will not be provided.

All Tender inquiries shall be directed to the Project Manager, Brian Snow, P.Eng. of WEB Engineering Ltd. bsnow@webengineering.ca. Only e-mail enquiries will be accepted. No technical inquiries will be taken within 72 hours (weekdays) of scheduled tender opening.

Non-Tender related public inquiries should be directed to Harry Long, Engineering Department, at the City of Surrey, telephone 604.591.4312.

The lowest or any tender will not necessarily be accepted. The City of Surrey reserves the right to reject any or all tenders and to waive informalities in any or all tenders. 

Closing Date:

Revised Closing:
May 8, 2014 - 11:00 am (local time)

Contact:

Mr. Harry Long - Project Supervisor
Engineering Department - Design & Construction
City of Surrey
Tel: 604.591.4312

Public Opening Results:

Company

Amount

Awarded to:

TAG Construction Ltd. $2,448,852.00 TAG Construction Ltd.
B&B Contracting (2012) Ltd. $2,466,600.00
GCL Contracting Ltd. $2,489,025.00
Imperial Paving Ltd. $2,511,261.90
Martens Asphalt Ltd.  $2,589,848.43  
Tybo Construction Ltd.  $2,629,925.08   
Richco Contracting Ltd.  $2,858,723.70   
Lafarge Canada Inc.  $2,860,685.10   

 

   

Status:

Awarded

Business & Economic Development Menu